While I was off at work at my engineering job this week, one of our CSA members was hard at work here at the farm putting the final stages on our new maple equipment. Fred took on the project, all the way from taking measurements and ordering the piping to cutting the hole in the roof and installing the stack. It was a wonderful feeling to know that this task was being taken care of and it saved me a ton of time for other things.
As you can see from the photos, he did a great job. All that was left for me to do was to install the gasket material to the top of the firebox, clean out the boiling pan and set everything into place. With those things done, we entered the weekend ready for a couple of warm days to get the sap flowing and excitedly looking forward to building the first fire in our new arch.